network cable certifications
Laying cables in boxes, in pipes and in the air on facades or piles equipped or to be equipped, in compliance with the project and with environmental and safety standards
Preparation of the equipment
Installation in manual piping, with winches, with water (floating system) or pressurized air (blowing system)
Laying in the tunnel
Cable arrangement in the wells
For indoor installation
Aerial pose
Laying the string and the self-supporting cable
Laying of mini pipes in existing pipes
Installation of optical fiber mini cables
Labeling of cables and protective elements
Stock management and housing
Comments
Post a Comment